Milestones
- 2006 – Commenced production in APRIL-2006 with a humble beginning
- 2006 – ISO 9001-2000 Certification
- 2007 – Started Management information system (MIS)
- 2008 – Started export casting production with Flowserve Corporation, Canada
- 2008 – PED 97/23 EC Certification
- 2008 – Machining activity started
- 2009 – NTPC Approval
- 2010 – Started production on 2 MT capacity melting furnace
- 2011 – Well Known IBR Foundry approval from Central boilers board
- 2012 – Expansion done to increase the production capacity
- 2013 – Norsok approval in grade 4A ,5A,6A, and CF3M
- 2014 – Tulip Castech, Birth of a sophisticated machine shop
- 2015 – ISO 9001-2008 Group certification as TGC (Tulip group of companies)
- 2016 - Norsok Re-approval in grade 4A ,5A/6A, CF3M & LCC
- 2016 --Continuous sand mixing plant installed
- 2017 - Addition of new machines and capacity expansion.
- 2017 - 5 MT LPG Heat treatment furnace installed
- 2019 – 5 MT Induction Melting furnace installed
- 2019 –Tulip Casting plant II (For fettling NDT)
- 2020 – Expansion done in machine shop 3 MTR CNC VTL machine installed
- 2022 - Radial Drilling Machine installed
- 2023 - Hart ford Make double column VMC
- 2023 - Webster make conventional VTL